Tudor Gold Corp Reports Gold Equivalent Results for All Drill Holes at the Company's Flagship Treaty Creek Project

P&E Mining Consultants Inc. Provides Drill Hole Spacing Recommendation for the 2020 Drill Plan at the Treaty Creek Project

March 03, 2020 4:00 AM EST | Source: Tudor Gold Corp.

Vancouver, British Columbia--(Newsfile Corp. - March 3, 2020) - Tudor Gold Corp. (TSXV: TUD) (FSE: TUC) (the "Company" or "Tudor Gold") is pleased to announce the results of gold-equivalent (AuEq) calculations for all drilling completed at Company's flagship project Treaty Creek. These calculations include credit for previously analyzed values for Cu and Ag. Geological analysis and reinterpretation of all the drill holes to date exposed a new copper horizon (CS 600 horizon) as well as significant silver and copper mineralization throughout the Goldstorm system.

  • The strongest AuEq increase was seen in the newly discovered NE Extension within the 300 Horizon. The gold-only result of 1.27 gpt Au over a 252 metre (m) interval increased to 1.51 gpt AuEq (with 13.8 gpt Ag and 504 ppm Cu), an increase of 18.9%.

  • All drill holes at Goldstorm Zone had significant increases to the composite results when the AuEq values for the copper and silver mineralization were included however when the drill holes intersected the CS-600 Horizon, the copper values within this mineralized body had the greatest impact to an individual horizon with up to 79.8% increase to the AuEq value from a gold-only 0.39 gpt Au over 150m to 0.70 gpt AuEq over the same 150m interval.

  • P&E Mining Consultants Inc. were retained to assess all Goldstorm drill hole results and historical data in order to render an opinion as to the consistency of the gold mineralization as well to ascertain the recommended drill hole spacing that would be required to potentially derive a Indicated Mineral Resource and a Measured Mineral Resource. P&E Mining Consultants Inc. concluded the following:

  • "Three dimensional continuity analyses of the Treaty Creek drill hole assay results were carried out for the Goldstorm Zone. The regional geological trend was used to guide the selection of horizontal, across-strike, and dip-plane directions during variogram fan analysis. Variogram fans were generated separately for Ag, Au, Cu, Pb, and Zn uncapped composite samples in each zone. 

  • All modeled semi-variograms display a very low nugget effect, and display long range continuity down the plunge of the mineralization and along the regional strike of the deposits.

  • For the Goldstorm Zone, a drill spacing of 200 m is recommended for Indicated Mineral Resources, and 100 m for Measured Mineral Resources." 

  • The Company's goal is to design a diamond drill hole program that will fast-track the exploration program for 2020 with the objective to begin the Mineral Resource Estimate work as soon as possible.

Vice President of Project Development, Ken Konkin P.Geo. comments: "We are very encouraged to see that the silver and copper mineralization has made an important impact to the AuEq results from our recent drilling as well as the historical drilling. The next step is to plan the drill hole program for the 2020 exploration season. We continue to work with our Mineral Resource Estimate geologists and engineers from P&E Mining Consultants to plan the drill hole program in order to optimize the drilling and to attempt to fast-track the exploration program for this coming drill season.

Table l provides gold equivalent composites from the 2019 drilling and all historical drilling within the Goldstorm Zone. Table ll contains the drill data including collar location, depth of drill hole as well as the dip and azimuth for all drill hole.

TABLE l: Au Eq COMPOSITES GOLDSTORM ZONE

Section

HOLE ID

From

To

Interval (m)

AuEq
g/t

Au
g/t

Ag
g/t

Cu
ppm

% increase

Horizon

107+00 NE

CB-17-29

1.20

575.00

573.80

0.321

0.278

0.9

224

15.5%

300

107+00 NE

CB-17-29

60.50

333.50

273.00

0.435

0.392

1.1

197

11.0%

300

107+00 NE

CB-17-29

60.50

176.00

115.50

0.728

0.685

1.9

142

6.3%

300

107+00 NE

CB-18-32

196.50

783.50

587.00

0.542

0.497

1.6

177

9.1%

300 + CS600

107+00 NE

CB-18-32

196.50

316.50

120.00

1.082

1.045

1.7

106

3.5%

300

107+00 NE

CB-18-34

419.00

711.50

292.50

0.499

0.461

2.4

63

8.2%

300

107+00 NE

CB-18-34

831.50

897.50

66.00

0.290

0.221

1.3

361

31.2%

CS600

108+00 NE

CB-17-09

41.00

545.00

504.00

0.549

0.488

2.3

225

12.5%

300

108+00 NE

CB-17-09

41.00

200.00

159.00

0.782

0.708

2.9

261

10.5%

300

108+00 NE

CB-17-12

3.00

243.50

240.50

0.848

0.797

2.6

139

6.4%

300

108+00 NE

CB-17-12

33.00

224.00

191.00

0.979

0.923

3.0

134

6.1%

300

108+00 NE

CB-17-24

3.50

563.00

559.50

0.618

0.576

2.0

121

7.3%

300

108+00 NE

CB-17-24

62.00

275.00

213.00

1.018

0.945

3.9

180

7.7%

300

108+00 NE

CB-17-24

3.50

686.00

682.50

0.563

0.498

1.8

288

13.1%

300

108+00 NE

CB-18-36

659.50

772.00

112.50

0.487

0.454

1.8

74

7.3%

300

108+00 NE

CB-18-36

659.50

704.50

45.00

0.733

0.688

2.7

88

6.5%

300

108+00 NE

CB-18-36

682.00

703.00

21.00

1.101

1.035

4.6

79

6.4%

300

108+00 NE

CB-18-38

20.50

638.00

617.50

0.465

0.429

1.3

137

8.4%

300

108+00 NE

CB-18-38

248.50

353.00

104.50

0.733

0.639

3.4

360

14.7%

300

108+00 NE

CB-18-38

468.50

638.00

169.50

0.683

0.659

1.1

76

3.6%

300

108+00 NE

GS-19-40

23.00

350.00

327.00

0.501

0.443

1.72

251

13.1%

300

108+00 NE

GS-19-40

81.50

127.00

45.50

1.060

0.907

4.92

634

16.9%

300

108+00 NE

GS-19-41

27.50

353.00

325.50

0.724

0.589

5.25

480

22.9%

300

108+00 NE

GS-19-41

47.00

146.00

99.00

1.252

1.015

9.83

800

23.3%

300

109+00 NE

CB-16-03

88.00

708.00

620.00

0.582

0.534

1.5

202

9.0%

300

109+00 NE

CB-16-03

112.00

426.00

314.00

0.792

0.733

2.2

220

8.0%

300

109+00 NE

CB-17-04

152.10

327.00

174.90

0.827

0.803

1.0

76

3.0%

300

109+00 NE

CB-17-27

12.50

536.00

523.50

0.688

0.640

1.6

197

7.5%

300

109+00 NE

CB-17-27

12.50

350.00

337.50

0.807

0.758

2.0

169

6.5%

300

109+00 NE

CB-18-31

404.00

680.50

276.50

0.526

0.494

1.4

100

6.5%

300

109+00 NE

CB-18-31

481.00

597.00

116.00

0.773

0.732

1.8

124

5.6%

300

109+00 NE

CB-18-33B

599.00

623.00

24.00

0.435

0.367

5.4

22

18.5%

300

109+00 NE

GS-19-43

68.00

561.50

493.50

0.608

0.566

1.36

174

7.4%

300 + CS600

109+00 NE

GS-19-43

141.50

197.00

55.50

1.068

1.005

2.62

211

6.3%

300

109+00 NE

GS-19-43

405.50

561.50

156.00

0.785

0.718

1.50

325

9.3%

CS600

109+00 NE

GS-19-44

101.00

368.00

267.00

0.867

0.807

3.30

134

7.4%

300

109+00 NE

GS-19-44

125.00

275.00

150.00

1.143

1.065

4.62

151

7.3%

300

109+00 NE

GS-19-45

44.00

369.50

325.50

0.765

0.719

1.91

154

6.4%

300

109+00 NE

GS-19-45

62.00

278.00

216.00

0.947

0.901

2.27

122

5.1%

300

109+00 NE

GS-19-45

105.00

278.00

173.00

1.054

1.000

2.63

144

5.4%

300

109+00 NE

GS-19-46

34.50

628.50

594.00

0.550

0.510

1.31

165

7.8%

300 + CS600

109+00 NE

GS-19-46

175.50

337.50

162.00

0.778

0.734

1.93

135

6.0%

300

109+00 NE

GS-19-46

564.00

600.00

36.00

1.425

1.328

1.12

560

7.3%

CS600

110+00 NE

CB-17-06

182.50

589.50

407.00

0.767

0.675

3.1

369

13.6%

300

110+00 NE

CB-17-06

222.00

393.50

171.50

0.914

0.814

3.7

379

12.3%

300

110+00 NE

CB-17-07

99.50

530.00

430.50

0.697

0.625

2.4

293

11.5%

300

110+00 NE

CB-17-07

162.50

309.50

147.00

1.155

1.028

4.9

457

12.4%

300

110+00 NE

CB-18-37B

125.00

819.50

694.50

0.502

0.459

1.2

196

9.4%

300

110+00 NE

CB-18-37B

300.50

423.50

123.00

1.002

0.944

2.0

234

6.1%

300

110+00 NE

CB-18-37B

125.00

912.00

787.00

0.473

0.427

1.2

212

10.8%

300 + CS600

110+00 NE

GS-19-50

148.00

725.50

577.50

0.681

0.602

1.99

372

13.1%

300 + CS600

110+00 NE

GS-19-50

160.00

427.00

267.00

0.878

0.811

2.67

300

8.3%

300

110+00 NE

GS-19-50

652.00

736.00

84.00

0.816

0.571

2.53

1444

42.9%

CS600

110+00 NE

GS-19-51

119.00

365.00

246.00

0.777

0.722

2.31

187

7.6%

300

110+00 NE

GS-19-51

578.00

618.50

40.50

1.304

1.019

2.94

1693

28.0%

CS600

110+00 NE

GS-19-53

108.00

255.00

147.00

1.036

0.984

3.07

98

5.3%

300

111+00 NE

CB-18-39

141.50

705.30

563.80

1.086

0.981

4.4

352

10.7%

300

111+00 NE

CB-18-39

141.50

422.00

280.50

1.274

1.141

5.5

449

11.7%

300

111+00 NE

CB-18-39

539.00

695.00

156.00

1.247

1.154

4.6

257

8.1%

300

111+00 NE

GS-19-48

97.50

1024.50

927.00

0.793

0.677

3.00

543

17.1%

300 + CS600

111+00 NE

GS-19-48

97.50

426.00

328.50

1.152

1.048

4.30

354

9.9%

300

111+00 NE

GS-19-48

871.50

940.50

69.00

1.483

0.937

3.90

3364

58.3%

CS600

111+00 NE

GS-19-49

81.00

907.50

826.50

0.800

0.696

3.40

429

14.9%

300 + CS600

111+00 NE

GS-19-49

81.00

330.00

249.00

1.080

0.998

5.10

137

8.2%

300

111+00 NE

GS-19-49

483.00

606.00

123.00

1.042

0.941

1.80

538

10.7%

300

111+00 NE

GS-19-49

747.00

832.50

85.50

1.494

1.067

10.50

2035

40.0%

CS600

111+00 NE

GS-19-52

62.00

663.50

601.50

0.783

0.668

3.25

513

17.2%

300 + CS600

111+00 NE

GS-19-52

62.00

398.00

336.00

1.062

1.004

2.65

182

5.8%

300

111+00 NE

GS-19-52

513.50

663.50

150.00

0.703

0.391

6.49

1583

79.8%

CS600

112+50 NE

GS-19-42

63.50

843.50

780.00

0.849

0.683

5.80

650

24.3%

300 + CS600

112+50 NE

GS-19-42

63.50

434.00

370.50

1.275

1.097

10.00

393

16.2%

300

112+50 NE

GS-19-42

63.50

315.50

252.00

1.508

1.268

13.80

504

18.9%

300

112+50 NE

GS-19-42

717.70

843.50

125.80

0.902

0.522

3.80

2253

72.8%

CS600

114+00 NE

GS-19-47

117.50

1199.00

1081.50

0.697

0.589

3.40

450

18.3%

300 + CS600 + DS

114+00 NE

GS-19-47

200.00

501.50

301.50

0.867

0.828

2.10

96

4.7%

300

114+00 NE

GS-19-47

665.00

816.50

151.50

1.009

0.572

8.90

2228

76.4%

CS600

114+00 NE

GS-19-47

933.50

1176.50

243.00

0.996

0.908

4.80

207

9.7%

DS

* All assay grades are uncut and intervals reflect drilled intercept lengths. True widths have not been determined as the mineralized body remains open in all directions. Further drilling is required to determine the mineralized body orientation and true widths.

HQ and NQ2 diameter core samples were sawn in half and typically sampled at standard 1.5m intervals.

**Metal prices used to calculate the AuEq metal content are: Gold $1322/oz, Ag: $15.91/oz, Cu: $2.86/lb. All metals are reported in USD and calculations do not consider metal recoveries

TABLE ll: Goldstorm Zone Drill Hole Data

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4494/53078_a65e7eb2f4a59be5_002.jpg

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/4494/53078_a65e7eb2f4a59be5_002full.jpg

The goal is to design a diamond drill hole program for the 2020 exploration program with the objective to begin the Mineral Resource Estimate work at the end of the 2020 field season. Tudor hopes to accomplish as much drilling needed to bring a Measured and Indicated Mineral Resource Estimate forward as quickly as possible.

Walter Storm, President and CEO, stated: "These new gold equivalents are extremely encouraging as our technical team continues to take positive steps advancing Tudor Gold's flagship Treaty Creek Au-Ag-Cu project. Furthermore we received good news from P&E Mining Consultants Inc. that the drill hole spacing required to derive a Measured Resource is 100 meters due to the homogenous nature of the AuEq composites obtained to-date. During the new few weeks, our geologist and engineers will continue to work with the geological model and begin to prepare the diamond drill hole proposal for 2020."

QA/QC

Drill core samples were prepared at MSA Labs' Preparation Laboratory in Terrace, BC and assayed at MSA Labs' Geochemical Laboratory in Langley, BC. Analytical accuracy and precision are monitored by the submission of blanks, certified standards and duplicate samples inserted at regular intervals into the sample stream by Tudor Gold personnel. MSA Laboratories quality system complies with the requirements for the International Standards ISO 17025 and ISO 9001. MSA Labs is independent of the Company.

Qualified Person

The Qualified Person for this news release for the purposes of National Instrument 43-101 is the Company's Vice President of Project Development, Ken Konkin, P.Geo. He has read and approved the scientific and technical information that forms the basis for the disclosure contained in this news release.

About Tudor Gold

Tudor Gold is a precious and base metals explorer with properties in British Columbia's Golden Triangle, an area that hosts producing and past-producing mines and several large deposits that are approaching potential development. The 17,913 hectare Treaty Creek project (in which Tudor Gold has a 60% interest) borders Seabridge Gold Inc.'s KSM property to the southwest and borders Pretium Resources Inc.'s Brucejack property to the southeast. The Company also has a 60% interest in the Electrum Project, earn in options and 100% interests in other prospective projects located in the Golden Triangle area.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4494/53078_tg1.jpg

GOLDSTORM ZONE Section 109+00 NE View 030

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/4494/53078_tg2.jpg

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4494/53078_tg3.jpg

GOLDSTORM ZONE Section 114+00 NE View 030

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/4494/53078_tg4.jpg

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4494/53078_tg5.jpg

GOLDSTORM ZONE Section 112+50 NE View 030

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/4494/53078_tg6.jpg

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4494/53078_tg7.jpg

GOLDSTORM ZONE Section 111+00 NE View 030

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/4494/53078_td8.jpg

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4494/53078_tg9.jpg

GOLDSTORM ZONE Section 110+00 NE View 030

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/4494/53078_tg10.jpg

"Walter Storm"
Walter Storm
President and Chief Executive Officer

For further information, please visit the Company's website at www.tudor-gold.com or contact:

Catalin Kilofliski 
Director Corporate Development and Communications
Tel. 604-559-8092
Email: catalin@tudor-gold.com

Carsten Ringler
Manager Investor Relations
Phone: +49 1726918274
E-Mail: carsten.ringler@tudor-gold.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statements regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. "Forward-looking information" includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including the completion and anticipated results of planned exploration activities, and plans to derive mineral resource estimates. Generally, but not always, forward-looking information and statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connation thereof.

Such forward-looking information and statements are based on numerous assumptions, including among others, that the Company's planned exploration activities will be completed in a timely manner. Although the assumptions made by the Company in providing forward-looking information or making forward-looking statements are considered reasonable by management at the time, there can be no assurance that such assumptions will prove to be accurate.

There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's plans or expectations include risks relating to the actual results of current exploration activities; fluctuating gold prices; possibility of equipment breakdowns and delays; exploration cost overruns; risks associated with the interpretation of data regarding the geology, grade and continuity of mineral deposits; the uncertainty of the geology, grade and continuity of mineral deposits and the risk of unexpected variations in any mineral resources, grade and/or recovery rates; availability of capital and financing; general economic, market or business conditions; regulatory changes; timeliness of government or regulatory approvals; and other risks detailed herein and from time to time in the filings made by the Company with securities regulators.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.

The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise except as otherwise required by applicable securities legislation.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/53078

info