Prismo Metals Intersects 10.2 g/t Gold over 6.6m at Los Pavitos Project
October 17, 2023 1:55 PM EDT | Source: Prismo Metals Inc.
Vancouver, British Columbia--(Newsfile Corp. - October 17, 2023) - Prismo Metals Inc. (CSE: PRIZ) (OTCQB: PMOMF) ("Prismo" or the "Company") is pleased to announce that high-grade gold mineralization has been cut in four of the first eight holes ever drilled at the 5300 ha Los Pavitos Project in the well mineralized Alamos region of southern Sonora State, Mexico.
The holes targeted the Hedionda mine zone along the Santa Cruz structure (Figures 1 and 2) and were designed to determine the overall nature, geometry and lateral and vertical continuity of mineralization around this small historic working. Mineralization consisting of foliation-parallel sulphides surrounded by silicification was cut in several holes (Figure 3). The best hole, LP-SC-23-02, intersected 6.65 meters (core length) reporting 10.2 g/t gold and 47.0 g/t silver, within a wider interval of 11.93 meters (core length) averaging 5.77 g/t gold and 28.7 g/t silver. Drilling to date represents about 850 m out of a 2000-2500 m budget and drilling has already shifted to the parallel Santa Cruz Southeast structure roughly 300 m southeast. Assays are pending for the first holes there.
"We are very pleased to see such excellent high-grade results in the first holes ever into just one of several multi-kilometer structural trends we've identified cutting across the property. These structures have seen extensive prospecting and very small-scale mining, but the system has never been explored with a large-scale perspective and we are excited to see what the other structures reveal", Dr. Craig Gibson, President and CEO commented.
He continued "It's early days, but the style of mineralization we're encountering does not look like the epithermal veins typical of the region, but more resembles the "orogenic" or shear-hosted gold that supports some of Sonora's largest gold mines, possibly with an intrusion related sulfide-rich replacement component. We are eager to continue exploring this target style longoverlooked in this part of Sonora."
Table 1. Selected drill intercepts from the Los Pavitos project
Hole | From (m) | To (m) | Interval (m) | True Width (m) | Au g/t | Ag g/t | Cu % | Pb % | Zn % |
LP-SC-23-01 | 20.30 | 27.70 | 7.40 | 5.2 | 2.34 | 14.7 | 0.08 | 0.18 | 0.74 |
includes | 21.80 | 23.84 | 2.04 | 1.4 | 7.04 | 43.1 | 0.19 | 0.57 | 2.33 |
LP-SC-23-02 | 21.75 | 24.07 | 2.32 | 1.2 | 0.27 | 0.5 | 0.01 | 0.00 | 0.01 |
52.27 | 64.20 | 11.93 | 6.0 | 5.77 | *28.7 | 0.15 | 0.16 | 0.38 | |
includes | 54.88 | 61.53 | 6.65 | 3.3 | 10.22 | *47.0 | 0.17 | 0.29 | 0.65 |
LP-SC-23-03 | No | Values | |||||||
LP-SC-23-04 | No | Values | |||||||
LP-SC-23-05 | 62.24 | 66.74 | 4.50 | 3.6 | 0.50 | 2.1 | 0.01 | 0.00 | 0.01 |
LP-SC-23-06 | No | Values | |||||||
LP-SC-23-07 | 49.00 | 59.40 | 10.40 | 8.3 | 1.52 | 18.9 | 0.11 | 0.09 | 0.06 |
49.00 | 55.00 | 6.00 | 4.8 | 2.52 | 28.7 | 0.15 | 0.14 | 0.10 | |
LP-SC-23-08 | 74.30 | 82.10 | 7.80 | 7.0 | 3.78 | 19.2 | 0.19 | 0.08 | 0.22 |
includes | 77.15 | 82.10 | 4.95 | 4.5 | 5.33 | 27.5 | 0.27 | 0.13 | 0.33 |
Au by fire assay for holes 1, 2, 7, & 8 others by ICP. *One overlimit Ag assay >100g/t taken at 100 g/t for the calculation of the average.
Mapping and surface sampling over the last year have delineated several kilometer-long mineralized structures with initial drilling at the Santa Cruz Southeast target to be followed by drilling of the Las Auras, Oromuri and Española targets (Figs. 1 and 2). At Las Auras surface sampling has encountered high grade gold values in several areas, and the latter two targets have characteristics indicating that similar high-grade mineralization may exist beneath cover. The abundance of sulphides at very shallow depths in the initial high-grade holes has led to consideration of geophysical surveys to trace such structures through cover. Exploration work is also advancing to develop additional new areas for drilling in several areas identified during reconnaissance work.
Table of drill hole data for the Phase I program at the Los Pavitos project
Hole | Target | Easting | Northing | Elev | Azim | Incl | Depth (m) | |
LPSC-23-01 | Hedionda mine | 677,103 | 3,002,113 | 215 | 310 | -45 | 27.70 | |
LPSC-23-02 | Hedionda mine | 677,109 | 3,002,109 | 207 | 310 | -55 | 87.00 | |
LPSC-23-03 | Hedionda mine | 677,082 | 3,002,157 | 201 | 130 | -45 | 60.00 | |
LPSC-23-04 | Hedionda mine | 677,082 | 3,002,157 | 201 | 130 | -60 | 75.00 | |
LPSC-23-05 | Hedionda mine | 677,109 | 3,002,109 | 207 | 270 | -45 | 75.00 | |
LPSC-23-06 | Hedionda mine | 677,060 | 3,002,060 | 210 | 325 | -45 | 72.00 | |
LPSC-23-07 | Hedionda mine | 677,048 | 3,002,147 | 202 | 130 | -45 | 81.00 | |
LPSC-23-08 | Hedionda mine | 677,055 | 3,002,147 | 205 | 160 | 45 | 109.50 |
Coordinates in UTM WGS84 using handheld Garmin GPS.
Figure 1. Geologic maps of Los Pavitos Project area showing major recognized mineralized trends and surface sampling results for gold. Inset shows silver results clustered in the SE Santa Cruz area.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7434/184298_ba014b8b5414a9ab_002full.jpg
Figure 2. Drill hole map for the Santa Cruz drilling areas.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7434/184298_ba014b8b5414a9ab_003full.jpg
Figure 3. Photographs of sulphide-rich, high-grade core from hole LP-SC-02, including the 6.65 meter core run from 54.88 to 61.53m reported 10.2 g/t Gold and 47.0 g/t Silver.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7434/184298_picture6.png
About Los Pavitos
The Los Pavitos project consists of a 5,289-hectare property position located in southern Sonora State, Mexico (Figure 4). Pavitos lies 25 km west of the well-mineralized Alamos District, which encompasses several active exploration and mining projects, including the past producing Alamo Dorado mine of Pan American Silver, the Piedras Verdes copper mine of Cobre de Mayo and the Alamos and Aurifero vein projects being explored by Minaurum Gold Inc. Infrastructure is excellent with paved highway access, electricity and water. The project, which was generated by geologist and Prismo Metals Board Member Rafael Gallardo, is believed to have potential for both the typical epithermal veins of the Alamos district and "orogenic" or shear-hosted gold hosted in the highly metamorphosed basement rocks that crop out sparingly below the region's extensive blanket of mid-Tertiary volcanic rocks. Los Pavitos lies along the projection of the Caborca Orogenic Gold Belt (Fig. 4) and the fabric and style of metamorphic deformation of the basement rocks is similar to that elsewhere in the belt.
Pavitos was acquired from Minera Cascabel S.A. de C.V., a Mexican exploration and services company founded by Dr. Peter Megaw, an advisor to the Company (for terms see the Company's prospectus filed on SEDAR). The company completed a NI 43-101 Technical Report on the project in March 2021 available on SEDAR. Assays have been received for 1,384 surface rock samples taken by the company (excluding control samples); a further 347 samples were taken in 25 trenches cut across the main mineralized trends.
Figure 4. Location of the Los Pavitos project in southern Sonora State in relation to the Caborca Orogenic Gold Belt.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7434/184298_ba014b8b5414a9ab_006full.jpg
Mapping and surface sampling over the last year have delineated several kilometer-long mineralized structures with initial drilling at the Santa Cruz Southeast target to be followed by drilling of the Las Auras, Oromuri and Española targets. At Las Auras surface sampling has encountered high grade gold values in several areas, and the latter two targets have characteristics indicating that similar high-grade mineralization may exist beneath cover. The abundance of sulphides at very shallow depths in the initial high-grade holes has led to consideration of geophysical surveys to trace such structures through cover. Exploration work is also advancing to develop additional new areas for drilling in several areas identified during reconnaissance work.
The trenching program across the main mineralized trends on the Los Pavitos property consisted of a cumulative length of 698 meters in 25 trenches. The best assays for individual samples are 20.4 g/t Au and 207 g/t Ag over 2 meters at Las Auras and 16.7 g/t Au and 48,2 g/t Ag over 1 meter at Santa Cruz. The main objective of the trenching program was to define the orientation and full width of the mineralized structures prior to starting the drill campaign.
QA/QC
Rock samples taken by Prismo are analyzed by multielement ICP-AES and MS methods and by fire assay by ALS Group and Bureau Veritas, both internationally recognized analytical service providers. Gold is analyzed as part of an ICP package using a 15 or 25-gram aqua regia digestion, and is also analyzed by Fire Assay with an AA finish. Au overlimits >10 g/t are analyzed by fire assay with a gravimetric finish. Ag over 100g/t and Cu, Pb and Zn over 1% re-analyzed by the by overrange ICP methods. Certified Reference Materials including standard pulps and coarse blank material were inserted in the sample stream at regular intervals.
Dr. Craig Gibson, PhD., CPG., a Qualified Person as defined by NI-43-01 regulations and President, CEO and a director of the Company, has reviewed and approved the technical disclosures in this news release.
About Prismo
Prismo (CSE: PRIZ) is mining exploration company focused on two precious metal projects in Mexico (Palos Verdes and Los Pavitos) and a copper project in Arizona (Hot Breccia).
Please follow @PrismoMetals on Twitter, Facebook, LinkedIn, Instagram, and YouTube
Prismo Metals Inc.
1100 - 1111 Melville St., Vancouver, British Columbia V6E 3V6
Contact:
Craig Gibson, President & Chief Executive Officer craig.gibson@prismometals.com
Jason Frame, Manager of Communications jason.frame@prismometals.com
Neither the Canadian Securities Exchange accepts responsibility for the adequacy or accuracy of this release.
Cautionary Note Regarding Forward-Looking Statements
This press release contains forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable Canadian securities legislation. All statements other than statements of historical fact, including without limitation, statements regarding the anticipated content, commencement and exploration program results, the ability to complete future financings, required permitting, exploration programs and drilling, and the anticipated business plans and timing of future activities of the Company, are forward-looking statements. Forward-looking statements are typically identified by words such as: believe, expect, anticipate, intend, estimate, postulate and similar expressions, or are those, which, by their nature, refer to future events. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct.
The Company cautions investors that any forward-looking statements by the Company are not guarantees of future results or performance, and that actual results may differ materially from those in forward looking statements as a result of various factors, including, but not limited to, the state of the financial markets for the Company's equity securities, the state of the commodity markets generally, variations in the nature, the analytical results from surface trenching and sampling program, including diamond drilling programs, the results of IP surveying, the results of soil and till sampling program. the quality and quantity of any mineral deposits that may be located, variations in the market price of any mineral products the Company may produce or plan to produce, the inability of the Company to obtain any necessary permits, consents or authorizations required, including CSE acceptance, for its planned activities, the inability of the Company to produce minerals from its properties successfully or profitably, to continue its projected growth, to raise the necessary capital or to be fully able to implement its business strategies, the potential impact of COVID-19 (coronavirus) on the Company's exploration program and on the Company's general business, operations and financial condition, and other risks and uncertainties. All of the Company's Canadian public disclosure filings may be accessed via www.sedar.com and readers are urged to review these materials, including the technical reports filed with respect to the Company's mineral properties.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/184298