Lavras Gold Returns Broad Continuous Zones of Gold Mineralization from Ongoing Fazenda - Butiá Drilling in Brazil

January 05, 2026 7:00 AM EST | Source: Lavras Gold Corp.

  • Results demonstrate broad, continuous zones of gold mineralization consistent with the geological model for the Lavras do Sul alkaline intrusive complex.

  • Significant intersections include:

    • 25BT068: 190.00 m at 1.01 g/t Au from surface (incl. 21.00 m at 2.25 g/t Au)

    • 25BT067: 65.00 m at 0.88 g/t Au from 23.00 m (incl. 1.00 m at 16.05 g/t Au; and incl. 2.00 m at 11.28 g/t Au)

    • 25BT063: 21.00 m at 3.12 g/t Au from 42.00 m (incl. 1.00 m at 47.73 g/t Au; and incl. 1.00 m at 5.11 g/t Au)

  • 50 diamond drill holes (16,714m) have been completed at Butiá (33 holes, 9,791m) and Fazenda (17 holes, 6,923m) in 2025.

  • A 20,000-metre drilling program is planned for 2026 to advance the Fazenda/Butiá Project and drill test district-scale opportunities.

Toronto, Ontario--(Newsfile Corp. - January 5, 2026) - Lavras Gold Corp. (TSXV: LGC) (OTCQX: LGCFF) ("Lavras Gold" or the "Company") is pleased to announce new assay results from its ongoing diamond drilling program on the Butiá Gold Deposit ("Butiá") and adjoining Fazenda do Posto Gold Discovery ("Fazenda"), together described as the Fazenda/Butiá Project at the Lavras do Sul Project ("LDS Project") in Rio Grande do Sul, Brazil.

Today's results include 13 diamond drill holes completed at Butiá (10 holes) and Fazenda (3 holes) completed since the previous disclosure of drill results (see news release dated September 8, 2025), which continue to confirm the strength and continuity of the alkaline intrusive-related gold system extending across the district.

"Today's results are consistent with what we have seen across this system," said Hemdat Sawh, Interim CEO and CFO. "Broad mineralized intervals containing high-grade shoots continue to build the resource base at the Fazenda/Butiá Project and enhance our understanding of its geological drivers. These intersections feed directly into the geological models that will underpin the next phases of resource estimation and project development.

"Our drilling since September 2025 has been highly productive. By combining infill drilling, step-outs, and targeted geological drilling, we are simultaneously improving resource-classification confidence, expanding mineralization, and deepening our understanding of structures, alteration, metallurgical domains and mineralization vectors. This integrated approach is critical as we position the Fazenda/Butiá Project for a future development decision, while continuing to unlock the broader district-scale potential."

Table 1: Significant Drilling Results, Fazenda/Butiá Project

Drill HoleFrom
(m)
To
(m)
Interval
(m)
Grade
(g/t Au)
Comment
25BT072
48.069.021.01.100Perthitic Granite

Including51.052.01.09.753Perthitic Granite

Including60.061.01.02.303Perthitic Granite
25BT068
0.0190.0190.01.014Saprolite/Perthitic Granite/Episyenite

Including117.0138.021.02.247Episyenite
25BT067
23.088.065.00.877Perthitic Granite

Including41.042.01.016.050Perthitic Granite

Including51.053.02.011.278Perthitic Granite
25BT066
211.0286.075.00.743Perthitic Granite/Episyenite

Including238.0243.05.05.651Episyenite
25BT065
63.077.014.02.607Perthitic Granite

Including63.067.04.08.291Perthitic Granite


112.0210.098.00.577Perthitic Granite/Episyenite

Including140.0148.08.01.268Episyenite

Including158.0161.03.01.093Episyenite

Including170.0184.014.01.006Episyenite
25BT064
0.059.059.00.813Episyenite

Including8.019.011.01.056Episyenite

Including27.029.02.01.127Episyenite

Including35.056.021.01.050Episyenite
25BT063
42.063.021.03.117Perthitic Granite/Episyenite

Including54.055.01.047.733Episyenite

Including59.060.01.05.110Perthitic Granite
25FP048
0.033.033.00.799Perthitic Granite/Episyenite

Including11.012.01.018.067Perthitic Granite
Note: All intervals are reported as down-hole lengths; true widths are not yet known.

 

Cannot view this image? Visit: https://images.newsfilecorp.com/files/10429/279407_35c1b91d64b12a7e_002.jpg

Figure 1. Isometric view of Fazenda/Butiá wireframe (based on gold grade modelled at a nominal 0.2g/t Cut-off grade) showing the relative locations of the 13 diamond drill holes completed at this target since September 2025. 

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/10429/279407_35c1b91d64b12a7e_002full.jpg

Summary of Results

Drilling results released today comprised included drilling completed since September 2025, which has been designed as a combination of infill drilling to support future resource classification upgrades, step-out drilling to test extensions to previously defined mineralization, and geological drilling intended to better understand post-mineral structures, alteration patterns, geochemical vectors, and geometallurgical domains that may influence both tonnage and grade distribution.

Results showed wide envelopes of continuous mineralization with periodic higher-grade intersections related to zones of more intense brecciation, alteration and generally higher sulphide percentage. Drilling also continues to enhance geological, structural, and metallurgical understanding across the Fazenda/Butiá Project.

The Company continues to integrate structural (including geotechnical), lithological and alteration data with multi-element geochemistry and geometallurgical characterization. These datasets will form the foundation to progress the preparation of geological and mineral resource models.

Next Steps

In line with Lavras Gold's most recent corporate update (see news release dated November 24, 2025), the Company plans to complete 20,000 metres of diamond drilling in 2026. The objectives of this program will be to:

  1. Advance Fazenda/Butiá toward a mine development decision, supported by upgraded mineral resources and improved geological confidence.

  2. Continue systematic exploration across the LDS Project, leveraging the project's unique scale and peralkaline intrusive setting.

As part of the 2026 drill campaign and in efforts to advance the Fazenda/Butiá Project, Lavras Gold will:

  • Incorporate new drilling data into detailed 3D geological and structural models;

  • Refine geometallurgical domains to support future engineering studies;

  • Execute drilling focused on resource growth, classification upgrade, and district-scale exploration; and

  • Integrate multi-disciplinary datasets to drive targeting and project development.

Qualified Person

Jonathan Hill, Director and Interim Vice President of Exploration for Lavras Gold Corp., is the "Qualified Person" as ‎defined under National Instrument 43-101, Standards of Disclosure for Mineral Projects, and has reviewed and approved the technical information contained in this release.

QA/QC

Quality Assurance & Quality Control: Sample handling, preparation, and analysis are monitored through the implementation of formal chain-of-custody procedures and quality assurance/quality control programs designed to follow industry best practices.

All drill hole samples in this drilling program consist of split NQ diamond drill core. Drill core is logged and sampled in a secure facility located in Lavras do Sul, Rio Grande do Sul State, Brazil. Drill core samples for gold assay are cut in half using a diamond saw and submitted to ALS Laboratories Inc. in Goiania, Goiás State, Brazil for preparation by crushing to 85% passing 1.0 mm, riffle splitting to obtain 500g aliquots, and pulverizing to 85% passing 75 microns.

Pulps are shipped to ALS Laboratories Inc. in Lima, Peru and analyzed by a 50g fire assay and AAS finish. Three 50g aliquots are taken for samples in the mineralized zone and one aliquot is taken in fresh rocks. The average grade of the three aliquots is used to determine the final grade of the mineralized sample.

Certified standards, non-certified blanks and field duplicates are inserted into the sample stream at regular intervals, so that QA/QC accounted for about 10% of the total samples. Results are routinely evaluated for accuracy, precision, and contamination.

Lavras Gold has been targeting larger intersections of greater than 0.25 g/t gold. Intersections that are lower than this threshold may provide exploration insight and may therefore be disclosed. The Company maintains a robust QA/QC program that includes the collection and analysis of duplicate samples and the insertion of blanks and standards (certified reference material).

About the LDS Project

The LDS Project is centred on the town of Lavras do Sul in Rio Grande do Sul, Brazil. It is approximately 320 kilometres, or a 4.5-hour drive, from the state capital of Porto Alegre. The Company, through its subsidiary holds, directly or indirectly, contractual interests over 34 mineral rights covering approximately 23,000 hectares.

The LDS intrusive complex is a multiphase intrusive centre that is surrounded by coeval volcanic rocks to the east. Geologically, LDS is in the far south of the Neoproterozoic Mantiqueira Province, a 2,700-kilometre-long belt of tectonically and magmatically accreted terrains that stretch as far south as the coastline of central Uruguay and north into southern Bahia State in Brazil. The most advanced targets are the Butiá and Cerrito gold deposits - Butiá with 12.9 million tonnes grading 0.91 grams per tonne (g/t) gold containing 377,000 ounces in the Measured and Indicated categories and 3.7 Mt grading 0.97 g/t gold containing 115,000 ounces in the Inferred category, and Cerrito with 8.2 Mt grading 0.70 g/t gold containing 188,000 ounces in the Indicated category and 13.2 Mt grading 0.69 g/t gold containing 293,000 ounces in the Inferred category.1,2

  1. NI 43-101 Technical Report Mineral Resource for the Butiá Gold Prospect, Rio Grande do Sul, Brasil. Prepared by VMG Consultoria e Soluções Ltda. January 25, 2022 (Effective Date).
  2. NI 43-101 Technical Report Mineral Resource for the Cerrito Gold Prospect, Rio Grande do Sul, Brasil. Prepared by VMG Consultoria e Soluções Ltda. May 31, 2022 (Effective Date).

About Lavras Gold Corp.

Lavras Gold Corp. is a Canadian exploration company focused on realizing the potential of its LDS Project situated in a highly prospective gold district in southern Brazil. The LDS Project is located near the town of Lavras do Sul in Rio Grande do Sul, in Rio Grande do Sul State of Brazil and is primarily an intrusive hosted gold system of possible alkaline affinity. More than 24 gold prospects centred on historic gold workings have been identified on the LDS Project properties, which span more than 23,000 hectares. For more information on Lavras Gold visit www.lavrasgold.com .

On Behalf of Lavras Gold Corp.

"Hemdat Sawh"

Interim CEO and CFO

Hemdat Sawh, Interim CEO, and CFO
Phone: +1-289-624-1375
Email: investor@lavrasgold.com
Website: www.lavrasgold.com

Disclaimer: Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward looking statements: This news release includes certain "forward-looking information" within the meaning of Canadian securities legislation and "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively "forward looking statements"). Forward-looking statements include predictions, projections and forecasts and are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "estimate", "forecast", "expect", "potential", "project", "target", "schedule", "budget" and "intend" and statements that an event or result "may", "will", "should", "could" or "might" occur or be achieved and other similar expressions and includes the negatives thereof. All statements other than statements of historical fact included in this release, are forward-looking statements that involve various risks and uncertainties, including regarding the Company's plans to carry out work, complete a technical report and a PEA. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements are based on a number of material factors and assumptions. Important factors that could cause actual results to differ materially from Company's expectations include actual exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, uninsured risks, regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the Company with securities regulators. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ from those described in forward-looking statements, there may be other factors that cause such actions, events or results to differ materially from those anticipated. There can be no assurance that forward-looking statements will prove to be accurate and accordingly readers are cautioned not to place undue reliance on forward-looking statements.

Table 2. Diamond drill hole data for Fazenda/Butiá for 13 holes drilled since September, 2025

Drill HoleEastingNorthingElevation (metres)Azimuth (Degrees)Dip (Degrees)Start Depth (metres)Final Depth (metres)
25_BT_0632181916586513382200-600354.86
25_BT_0642181136586447390200-600369.54
25_BT_0652181376586379395290-600345.79
25_BT_06621803165865643710-900401.71
25_BT_0672182776586588373110-600186.51
25_BT_0682181156586588367200-600391.32
25_BT_0692183316586625372290-600142.43
25_BT_0702179856586535375200-600214.34
25_BT_0712182446586554381110-600102.33
25_BT_072218245658655036620-600139.51
25_FP_0462175506586811380110-600607.09
25_FP_0472175536586810381260-600483.99
25_FP_0482179346586557376200-600318.45

 

Table 3. Results for all diamond drill intersections Fazenda/Butiá for 13 holes drilled since September, 2025

Drill HoleFrom
(m)
To
(m)
Interval
(m)
Grade
(g/t Au)
Comment
25BT072
5.006.001.000.408Perthitic Granite


39.0040.001.000.201Perthitic Granite


48.0069.0021.001.100Perthitic Granite

Including51.0052.001.009.753Perthitic Granite

Including60.0061.001.002.303Perthitic Granite
25BT071
52.0053.001.001.370Perthitic Granite


59.0061.002.001.080Perthitic Granite
25BT070
2.0037.0035.000.477Episyenite

Including19.0020.181.181.342Episyenite

Including33.0037.004.001.206Episyenite


44.0045.001.000.299Perthitic Granite


111.00112.001.000.224Perthitic Granite


147.00151.004.000.216Perthitic Granite
25BT069
8.0015.007.000.328Saprolite
25BT068
0.00190.00190.001.014Saprolite/Perthitic Granite/Episyenite

Including7.008.001.003.493Saprolite

Including50.0051.001.002.032Perthitic Granite

Including58.0059.001.002.237Episyenite

Including99.00100.001.002.837Episyenite

Including107.00108.001.0014.650Episyenite

Including113.00114.001.002.450Episyenite

Including117.00138.0021.002.247Episyenite

Including144.00147.003.002.227Episyenite

Including151.00152.001.002.203Episyenite

Including154.00155.001.002.058Episyenite

Including180.00181.001.002.030Episyenite

Including183.00184.001.003.293Episyenite

Including186.00187.001.0018.667Episyenite


274.00275.001.000.247Perthitic Granite


280.00281.001.000.201Episyenite


287.00306.0019.000.202Perthitic Granite/Episyenite

Including305.00306.001.000.930Perthitic Granite


316.00320.004.000.210Perthitic Granite
25BT067
0.002.002.001.526Perthitic Granite


23.0088.0065.000.877Perthitic Granite

Including41.0042.001.0016.050Perthitic Granite

Including51.0053.002.0011.287Perthitic Granite


75.0088.0013.000.220Perthitic Granite


99.00101.002.000.321Perthitic Granite


119.00120.001.000.499Perthitic Granite


149.00150.001.000.316Perthitic Granite
25BT066
22.0027.005.000.512Perthitic Granite

Including24.0025.001.001.237Perthitic Granite


93.0098.005.000.421Perthitic Granite/Episyenite


169.00170.001.000.296Perthitic Granite


188.00191.003.000.266Perthitic Granite


211.00286.0075.000.743Perthitic Granite/Episyenite

Including238.00243.005.005.651Episyenite

Including281.00282.001.002.907Perthitic Granite


302.00303.001.000.246Perthitic Granite
25BT065
63.0077.0014.002.607Perthitic Granite

Including63.0067.004.008.291Perthitic Granite


83.0098.0015.000.219Perthitic Granite


112.00210.0098.000.577Perthitic Granite/Episyenite

Including140.00148.008.001.268Episyenite

Including158.00161.003.001.093Episyenite

Including170.00184.0014.001.006Episyenite


220.00228.008.000.236Perthitic Granite/Episyenite


297.00298.001.000.263Perthitic Granite


300.00301.001.000.208Perthitic Granite


305.00306.001.000.251Perthitic Granite
25BT064
0.0059.0059.000.813Episyenite

Including8.0019.0011.001.056Episyenite

Including27.0029.002.001.127Episyenite

Including35.0056.0021.001.050Episyenite


69.0084.0015.000.366Perthitic Granite/Episyenite

Including72.0073.001.001.071Perthitic Granite


121.00122.001.000.272Perthitic Granite


133.00136.003.000.508Perthitic Granite


144.00150.006.000.432Perthitic Granite

Including149.00150.001.001.077Perthitic Granite


171.00183.0012.000.228Perthitic Granite

Including182.00183.001.000.814Perthitic Granite


191.00192.001.000.229Perthitic Granite


198.00243.0045.000.417Perthitic Granite/Episyenite

Including213.00215.002.001.469Episyenite

Including222.00226.004.001.301Episyenite
25BT063
19.0021.002.000.247Perthitic Granite


26.0027.001.0089.867Perthitic Granite


42.0063.0021.003.117Perthitic Granite/Episyenite

Including54.0055.001.0047.733Episyenite

Including59.0060.001.005.110Perthitic Granite


71.0072.001.000.263Episyenite


93.00100.007.002.007Perthitic Granite/Episyenite

Including94.0095.001.008.890Episyenite


121.00133.0012.001.124Perthitic Granite/Episyenite

Including124.00125.001.008.197Perthitic Granite


161.00181.0020.000.312Episyenite

Including174.00175.001.000.999Episyenite


274.00275.001.000.215Perthitic Granite


307.00309.002.000.402Perthitic Granite
25FP048
0.0033.0033.000.799Perthitic Granite/Episyenite

Including11.0012.001.0018.067Perthitic Granite


56.0057.001.000.483Metassomatites


70.00119.0049.000.258Episyenite


200.00201.001.000.788Episyenite
25FP047
115.00116.001.000.696Metassomatites


309.00311.002.000.203Lamprophyre Dyke


368.00369.001.000.318Metassomatites


371.00372.001.000.295Metassomatites


395.00396.001.000.234Metassomatites
25FP046
475.00476.001.000.374Perthitic Granite


518.00519.001.001.087Perthitic Granite







 

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/279407

info

Source: Lavras Gold Corp.

Ready to Announce with Confidence?

Send us a message and a member of our TMX Newsfile team will contact you to discuss your needs.

Contact Us