Kuya Silver: An Overview of the Bethania Silver Mine PEA
Thursday, May 5th - 10am PT / 1pm ET
Economics
- Base case ($25.40/oz silver price) Pre-Tax NPV (5%) of $77.8 Million and IRR of 227%
- Base case ($25.40/oz silver price) After-Tax NPV (5%) of $54.7 Million and IRR of 188%
- Pre-production toll milling option would generate gross margin of $9.5 Million during construction at base case, would accelerate after-tax payback period to 0.50 years
Production
Production (head) grade of 13.8 oz/t (or 429 g/t) silver equivalent in pre-production year, 10.1 oz/t (or 315 g/t) silver equivalent over LOM.
CAPEX
Initial capital cost estimated at $14.2 Million plus 25% contingency of $3.6 Million.
About the Bethania Silver Mine
Privately owned for the past forty years, the mine produced a high-grade silver ore from several veins in a structurally controlled swarm. Although 70% of the value is contained in silver, the veins also host recoverable lead, zinc, copper and gold. More than 6 km of underground workings currently access 7 of 18 known veins right at or close to surface, with significant upside remaining along strike and at depth.
David Stein
President & CEO
Christian Aramayo
Chief Operating Officer
Chris Marcus
Host, Arcadia Economics