ACME Lithium Commences Project Wide Exploration Program in Southeastern Manitoba

July 07, 2022 8:00 AM EDT | Source: ACME Lithium Inc.

Vancouver, British Columbia--(Newsfile Corp. - July 7, 2022) - ACME Lithium Inc. (CSE: ACME) (OTCQB: ACLHF) (the "Company", or "ACME") is pleased to report that it has commenced an extensive summer exploration program at ACME's 11,803 acre Shatford and Cat-Euclid Lake project areas in southeastern Manitoba.

ACME's Shatford Lake claim area is located strategically and contiguous to the south of Sinomine's world class Tanco Mine, a Lithium, Cesium and Tantalum producer (LCTs) since 1969, located in the pegmatite fields of the southern limb of the Bird River Greenstone Belt (BRGB). ACME's Cat-Euclid Lake project claims are approximately 20 kilometres to the north of the Tanco Mine.

ACME Lithium's exploration strategy in the Bird River Greenstone Belt is to employ remote sensing, structural geology, ground-based geological mapping, and geochemical sampling to localize targets for drilling. Our exploration focus is on spodumene-bearing LCT pegmatites that can be a source for lithium carbonate deposits.

At both projects, three two-man crews will focus exploration in areas with abundant outcrop in favourable structural areas. Work will involve soil, rock, and till sampling. Structural mapping will be done on outcrops within the favourable structural domains to identify joint sets favoured to host pegmatite bodies.

Dane Bridge, P. Geol. is a Qualified Person as defined by NI 43-101 and has supervised the preparation of the scientific and technical information that forms the basis for this news release.

About ACME Lithium Inc.

Led by an experienced team, ACME Lithium is a mineral exploration Company focused on acquiring, exploring, and developing battery metal projects in partnership with leading technology and commodity companies. ACME has acquired or is under option to acquire a 100-per-cent interest in projects located in Clayton Valley and Fish Lake Valley, Esmeralda County Nevada, and at Cat-Euclid and Shatford Lakes in southeastern Manitoba.

On behalf of the Board of Directors

Steve Hanson
Chief Executive Officer, President and Director
Telephone: (604) 564-9045
info@acmelithium.com

Neither the CSE nor its regulations service providers accept responsibility for the adequacy or accuracy of this news release. This news release may contain forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur and in this news release include but are not limited to the attributes of, timing for and expected benefits to be derived from exploration, drilling or development at ACME's project properties. Information inferred from the interpretation of drilling, sampling and other technical results may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company's properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from the Company's operations and other risks and uncertainties. Any forward-looking statement speaks only as of the date it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/130209

info